Chanchiyo Holdings Group

Welcome to MCLLROY!

Manufacturer from China
Verified Supplier
3 Years
Home / Products / 2 Ton Wheel Loader /

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

Contact Now
Chanchiyo Holdings Group
Visit Website
City:guangzhou
Province/State:guangdong
Country/Region:china
Contact Person:Jell Young
Contact Now

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

Ask Latest Price
Video Channel
Brand Name :MCLLROY
Model Number :MCL932 ZL932
Certification :CE,ISO9001
Place of Origin :China
MOQ :1 Set
Price :$ 4000-6000 /Unit
Payment Terms :30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
Supply Ability :100 sets / month
Delivery Time :5-8 working days
Packaging Details :Nude ,3 Sets Fasten Packing in 1 40HQ
Moving type :Wheel Loader
Dimension(long * breadth * high) :5500*1620*2750mm
Condition :New
Dumping height :3200mm
Machine weight :3500KG
Engine power :58kw
Type :Front Loader
After-sales service provided :Engineers available to service machinery overseas,Video technical support,Online support
Color :Customize
Attachments :Fork,Snow bucket,Kinds,trencher
Engine Model :YN490 Supercharged
speed/min :2400
Gear Box :CVT
Alex :S-hub reductro
Frame :Articulated
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

3500kg Weight Small Front End Wheel Loader, 1.0m³ Bucket Capacity Wheel Shovel Wheel Loader

1. Products Description

In general, for construction machinery, the four most important factors are: price, quality, operation, and after-sales.

The amount of shovel material and the stability of the loader depend on the cooperation of the loader frame.

The flexibility and light operation mainly depends on the hydraulic system of the loader.

The low failure rate depends on quality as well as the after-sales service.


MCLLROY wheel Loaders are widely used in the construction, municipal engineering, urban and rural gardens, lime, sand, cement factories, mines and other enterprises and institutions and departments. It is particularity applied to the narrow space for the loading operation of stone,sand and other construction materials.

2. Specification

Model MCL932
ZL932
MCL936
ZL936
Rated Load kg 1800 2000
Dipper Bucket Capacity m³/m 1.0/1.9m 1.1/2.0m
Max.Dump Clearance mm 3200 3500
Dump Reach mm 1350 1650
Overall Size (L*W*H) mm 5500*1620*2750 6025*2000*3000
Engine Model YN490 YN4100 Supercharged
Rated power kw 58 65
speed/min rpm 2400 2400
Gear Box CVT 280B Split Torque converter
Alex S-hub reductro M-hub reductro
Operating Weight kg 3300 5300
Articulated Articulated Articulated
Tyre Size 20.5-16 1670-20
Joystick included Mechanical Mechanical
Aircon included included
Hydraulic pilot(option) *** Without
running hour meter running hour meter running hour meter
air brake air brake air brake

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

  • Engine:Strong driven force ,low fuel consumption ,high economic benefits.
  • Transmission:Split torque converter,not high temperature,easy to repair.
  • Axle: Heavy-duty axle ,planetary reduction ,solid and durable ,with the corresponding tires ,for the loader to provide.
  • Hydraulic system:Fully optimized layout of pipes Waterproof connectors.

4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

Spray painting:

Normally, the spray painting process includes hanging the parts, spraying primer or first layer coating, baking finish, spraying second layer coating, baking finish, drying in three different temperature.

The workers in charge of hanging will check if the part has dust and oil, anything that will affect painting, which will be removed.

There are two worker at Station 1 to do the painting on one side of the part.

Another 2 workers at Station 2 will paint the other side, and the third worker will check if there is any spot missing and repaint.

Next is our baking room and No. 1 to No. 3 drying machines.

Pick up station workers use forklift to transfer the finished parts to the part's corresponding storage place, which is usually next to the production line.

Some factories only hire one person to take care of the spray painting to cut the cost. It is hard to control the painting quality like that.

Our technicians in the painting process are supposed to control the painting flow rate just right, without over painting, and the thickness of each surface should be balanced. In the pick up Station, there are special personnel for quality inspection of painted parts. Similarly, our factory adopts report mechanism. Subsequent assembly or factory inspection inspector find that the spray painting is unqualified and they will report it.

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

1m3 Bucket Small Articulating Front End Loader For Construction Machinery

Similar Model:

Cat 903D/906M/907M/908M

XCMG LW156/LW160/LW180/LW186/LW200

Liugong 816C

SDLG LG916 LG918 L918

Inquiry Cart 0