Chanchiyo Holdings Group

Welcome to MCLLROY!

Manufacturer from China
Verified Supplier
3 Years
Home / Products / 2 Ton Wheel Loader /

Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

Contact Now
Chanchiyo Holdings Group
Visit Website
City:guangzhou
Province/State:guangdong
Country/Region:china
Contact Person:Jell Young
Contact Now

Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

Ask Latest Price
Video Channel
Brand Name :MCLLROY
Model Number :MCL932 ZL932
Certification :CE,ISO9001
Place of Origin :China
MOQ :1 Set
Price :$ 4000-6000 /Unit
Payment Terms :30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
Supply Ability :100 sets / month
Delivery Time :5-8 working days
Packaging Details :Nude ,3 Sets Fasten Packing in 1 40HQ
Rated power :58kw
Max.Dump Clearance :3200mm
Rated Load :1800kg
Bucket Capacity :1.0m3
Operating Weight :3670 kg
Emissions :EU Stage II
Engine Model :Yun Nei 490 Supercharged
Max. Travel Speed :28 km/h
Gear Box :CVT 265 torque converter
Axle :Small hub
Axle Base :2210 mm
Brake :Disc Brake
Hydraulic Cycle time - lift :≤ 7 s
Min. Ground Clearance :290 mm
Wheel Base :1490 mm
Reach at Max.Dump Height :3200 mm
Dump Reach :≤ 650 mm
Overall Length - With Bucket :5300 mm
Overall Width :1820 mm
Overall Height :2670 mm
Tyre Size :20.5-16
Breakout Force :40 KN
Joystick :Machanical
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

2 Ton Loader Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

1. Products Description

MCLLROY wheel loader is wildly used in construction, agriculture ,garden,etc. And we are experiencing in making high quality efficiency productivity.Strong power and chassis help to muddy road condition,flexible turning is suitable for small space ,excellent unloading height helpful for loading.

For the axle of this loader, we use cast steel small axle housing. There are iron axle and Isuzu axle on the market. The axles play a key role in loader working and walking. Especially under severe working conditions, the internal forces of the axles is large. A good axle allows users to drive safely and work with confidence.

2. Specification

MODEL MCL 932/ZL 932 Metric Units
ENGINE Engine Model Yun Nei 490 Supercharged
RPM 2400
Rated Power 58 kW
Emissions EU Stage II
WEIGHTS Operating Weight 3670 kg
Rated Load 1800 kg
BUCKETS Bucket Capacities 0.6-1.0 m³
TRANSMISSION Max. Travel Speed 28 km/h
Gear Box CVT
265 torque converter
Axle Small hub
Axle Base 2210 mm
Brake Disc Brake
HYDRAULIC SYSTEM Hydraulic Cycle time - lift ≤ 7 s
DIMENSIONS(APPROXIMATE) Min. Ground Clearance 290 mm
Wheel Base 1490 mm
Reach at Max.Dump Height 3200 mm
Dump Reach ≤ 650 mm
Overall Length - With Bucket 5300 mm
Overall Width 1820 mm
Overall Height 2670 mm
OPERATING SPECIFICATIONS Tyre Size 20.5-16
Breakout Force 40 KN
Joystick Machanical
Min. turning radius ≤ 7000 mm
STANDARD EQUIPMENT Hour meter Yes
Tool Box Yes
Dual Hight&Low Speed Handle Yes
OPTIONAL EQUIPMENT Air Conditioning/heater Option
Quick Change Option
Multifunctional Attachment Option
Hydraulic Pilot Option

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

1) Tire:A variety of patterns to adapt to different perorations ,solid tires available.

2) Frame:Strong hinge joint.

3) Cab:

I. Electronic oil level indicator.

II. Comfortable seat with safety belt.

III. Intelligent instrument.

IV. Pilot valve hydraulic operation.

4) Wide-opening hood for easier servicing & maintenance of engine.

5) MCLLROY design engine cover,automatic power-off electronic flame-out ,no knife.

4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

Assembly:

Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.

First, our workers will assemble the front frame, rear frame, swing frame, front axle, rear axle together, and then install air tank, relief valve, air booster pump on the frame.

At this step, the worker should pay attention to the tightness of the screws and adjust the gap: for example, the hinged part is not supposed to move up and down and must be tight (can be shaken left and right); there is also a gap between the swing frame and rear frame, which can be moved up and down, but not back and forth; and Gear oil should be added to the front and rear axles.

Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened


Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

2 ton loader
front head loader
front end loaders
hydraulic front loader
front hand loader

Inquiry Cart 0